Fast repair of a defective cable carrier on a drilling rig for Noble Drill
On a Noble Drill drilling rig off the coast of Norway, a large cable carrier broke down. A Wisman specialist flew to the platform by helicopter, determined the right parts and coordinated the urgent delivery.

- Customer
- Noble Drill
- Sector
- Offshore
- Region
- North Sea, Norway
- Solution
- Service
01 · Challenge
Challenge
On a Noble Drill drilling rig off the coast of Norway, an acute problem arose: a large cable carrier had broken down. Conditions in the offshore industry are extreme; salt water, strong winds and constant mechanical stress push cable management to its limits. When a cable carrier fails on a drilling platform, operations come to an immediate standstill. In this sector, every minute of downtime costs thousands of euros. The challenge was not only the technical complexity of the heavy installation, but above all the speed of the logistics. A specialist had to be on site immediately to assess the damage, as standard solutions rarely suffice in this environment.
02 · Solution
Solution
Because we at Wisman Techniek have been the exclusive partner of Tsubaki Kabelschlepp since 1975, we know exactly which forces are at play in offshore applications. We acted immediately. One of our specialists boarded the helicopter to map the situation on the platform accurately. During this inspection, it became clear that parts of the existing cable carrier had to be replaced with parts able to withstand the corrosive sea air and the enormous tensile forces on the platform. Thanks to our in-depth knowledge of steel cable carriers, we were able to determine the exact specifications on the spot. We then coordinated the logistics to get the right components to the location urgently, so the repair could start without unnecessary delay.
03 · Result
Result
Thanks to our quick response and hands-on mentality, the installation was operational again in record time. We not only replaced the defective parts, but also gave advice on preventive maintenance to prevent future breakdowns. This project shows that our services go beyond just supplying a product; we are there when things get difficult, anywhere in the world. Noble Drill was able to resume drilling safely with a reliable system that will last for years in the harshest conditions. Do you have a cable management challenge in a demanding environment? Contact us for direct advice.
Photos · 6
The project in pictures
In practice
More from practice

Infrastructure
Infrastructure
Maeslantkering stainless steel cable carrier overhaul: service life extended
Maeslantkering, with Hollandia Services · Hoek van Holland
Service

Steel & heavy industry
Steel & heavy industry
Maximum performance at Tata Steel through predictive maintenance of cable carriers
Tata Steel · IJmuiden
Service

Steel & heavy industry
Steel & heavy industry
Supply, installation and preventive maintenance of all cable carriers at FN Steel
FN Steel
Service
Similar project
A comparable
challenge?
Describe your application. We think along on the right cable carrier, dress pack or cable entry and calculate it for you free of charge.
- Phone+31 88 002 3500
- E-mailverkoop@wisman-techniek.nl
- AvailableMon–Fri 08:30–17:00





11 specialists in Ruurlo
You speak directly to someone who knows.