Delivered ready to install,or assembled by us.

Most problems with cable carriers arise during installation. A crooked driver, cables that are not stress-free or missing strain relief cost months of service life. We prevent that: by delivering ready to install, or by doing it ourselves.

assembly of a cable carrier in the workshop in Ruurlo

What we do

Assembly & installation

We assemble in Ruurlo and install on site, together with or for your fitters.

  1. 01

    Assembly in the workshop

    We build the carrier to length, with the right distribution, end connectors and strain relief, ready to fit in one go.

  2. 02

    Complete with cables

    If desired, we deliver the carrier filled: cables and hoses cut to length, assembled, labelled and tested.

  3. 03

    Assembly on site

    Our fitters install the carrier and guide channel, align the fixed point and driver, and check the run over the full stroke.

  4. 04

    Conversion of existing machines

    We replace trailing cables or worn carriers, preferably during a planned stop, so production keeps running.

  5. 05

    Instruction for your fitters

    Fitting it yourself? We go through the assembly together and supply brief assembly instructions per project.

Technician at work on the railway bridge
InfrastructureCentral government
Wisman Techniek11Specialists, with one dedicated point of contact
Wisman Techniek15.000+Customers helped since 1975
The rotary carrier across the full width of the pivot pit
InfrastructureCentral government

Approach

In vier stappen geregeld.

With one fixed contact person, from the first question to the last step.

  1. 01

    Planning

    We schedule the installation for a time that suits your production planning.

  2. 02

    Assembly

    The carrier is built and tested in Ruurlo.

  3. 03

    Assembly

    Placement and alignment on site, or by your fitters.

  4. 04

    Handover

    Test run over the full stroke and handover.

For whom

Who it is for, and what it delivers

For whom

  • Machine builders who want to save assembly time
  • Maintenance departments with a planned stop
  • End users who want to replace a drag line
  • Teams without their own experience with cable carriers

What it gives you

  • Shorter assembly time in your own workshop
  • No assembly errors that shorten service life
  • One person responsible for carrier and assembly
  • An installation that was measured on delivery
WISMAN-BELOFTE · RUURLO · SINDS 1975 ·The Wisman promiseFour fixed commitments on every order, from a checked configuration to one dedicated point of contact.

In practice

Assembly & installation in practice

All projects
Cable carrier with cables and hoses in the basement of the Hanzebrug

Featured project

Cable management for 8 metres of expansion on the Hanzebrug near Hattem

The Hanzebrug on the Hanzelijn can expand or contract by up to 8 metres. We built two cable carriers on three height levels on site around the cables already pulled, with our own suspension brackets.

Customer
Central government
Location
Hattem
Sector
Infrastructure
Solution
Cable carriers
Travel length
Up to 8 m expansion
Environment
Outdoors, steel railway bridge
Read the project

Frequently asked questions

Over montage & installatie

More services

Also taken care of for you

All services

Contact

Ready for a cable carrier
that never stops?

Send your application. A specialist will think along with you on series, set-up and delivery time.

Call a specialist
Grego ErnstTieme ErnstOlaf OttenBas EgberinkDaan van Weeghel

11 specialists in Ruurlo
You speak directly to someone who knows.